新华翻译社总机:4008281111   客服部地址:南大街6号国务院机关第二招待宾馆(国二招)3号楼B5319室
 
机构概况
国家标准
翻译流程
翻译价格
人才信息
联系我们
 
首页>>>新华翻译社>>>果洛翻译公司

    影响翻译价格的因素主要有翻译资料的行业种类、专业深度、文件大小、文档格式、交稿期限、目标质量等。一般来说,专业性强、排版复杂、质量要求高的翻译稿件,价格相对较高。在翻译公司内部,流程环节越多的资料翻译报价自然越高。总体来说,多一道环节就多20%左右的费用。翻译价格,应该根据资料本身的情况和译文的用途、目的来确定,过高过低都不合适,合理的翻译费用区间和定价优惠幅度,要做到双赢才行。
    新华翻译社一直以优惠的翻译价格,过硬的翻译质量来赢得客户的好评和市场的青睐。虽然十多年来翻译行情不断波动调整,我们通过采用培训员工不断积累经验、利用软件科技不断降低成本、并向同行提供专业校对服务等方式,有效地扩大了专职翻译队伍,并组建了不同行业的项目组,根据熟能生巧和规模效应,提高了翻译工作效率,给广大客户提供了性价比高的翻译报价,降低了客户的费用预算。总之,翻译客户,选择新华,就是选择了专业翻译、优惠价格。
果洛翻译公司专业为高端客户提供英语、日语、德语、法语、韩语、俄语、西班牙语、意大利语、葡萄牙语、阿拉伯语等权威翻译服务。
 
 
 
果洛翻译公司收费合理专业项目团队真诚服务果洛州、玛沁县、班玛县、甘德县、达日县、久治县、玛多县
果洛翻译公司关键字:life and future prospects for the development of space exploration, the human environment, the system is unlimited.Second, the Earth is a finite universe of stars, from the earth of human survival and development environment, but there are limits. Earth's environment has a relatively extreme, and in the formation of the Earth have their own way and at the end of the limit, it is estimated about 50 billion years or so, will be destroyed with the destruction of the sun. Produce only about 500 million years of human history, the environmental conditions suitable for living organisms is the formation of Earth's evolution over a long period after it appeared, the availability of energy resources and there is the limit. 1996, the global water consumption has reached 6 trillion m3 ... ..., accounting for half the amount of fresh water available, if at the current rate, in another 30 years, human water usage limits can be reached; the world's arable land per capita is only 0.32 hectares was lower than that of demographers A Suowei lower limit of 0.4 hectares; 1993, 4.18 billion hectares of forest area, forest area per capita is only the beginning of the industrial revolution, 1 / 38, and is accelerating decline. According to the 1993 case has been proven, world gold reserves of only 6 million tons, then the amount of more than 2330 tons mined, can be mined for 26 years; silver reserves of only 42 tons, then exploitation of 14,100 tons, can be mined for 30 years. Iron ore reserves of 100 billion tons, annual output 513 million tons, but also exploitation of 188.3 years, which can be mined reserves in China 29 years. Copper reserves of 5.9 million tons, annual output of 9,337,000 tons, but also exploitation of 63.2 years. Lead reserves 130 million tons, annual output of 2.644 million tons, 49.5 years can be mined, which can be mined reserves in China 11.9 years. Tin reserves 10 million tons, annual output of 180,000 tons, but also exploitation of 55.5 years, of which the exploitation of reserves in China but also 29.6 years.
果洛翻译公司网站更新:
果洛翻译公司版权所有